Is your project ready for funding?

Being ready for funding implies coherence between problem, intervention, results, budget, risks and conditions required by each call for proposals.

Strategy and sustainabilityPreparation checklist50 approx. minNo account
NGOs, project teams and cooperationGap map for financial structuring

Free, non-binding material. Your responses are not sent to TBC.

Before you start

Readiness for funding requires more than a persuasive narrative: verified eligibility, a coherent design, complete costs, evidence and organizational approval. Candid recommends aligning proposal budgets with direct and indirect costs, income sources and planned activities [1]. This worksheet is a pre-application gap assessment; it cannot predict whether a grant will be awarded.

The deliverable is an eligibility and gap matrix: requirement, available evidence, cost and deadline to resolve a gap, owner and decision. It includes theory of change, delivery capacity, budget, co-funding, privacy safeguards and each funder's specific restrictions. The sheet cannot replace legal or financial advice or authorize institutional commitments.

Step-by-step application

  1. 1

    Read call for proposals

    Extract eligibility rules, deadlines and required documents from the call; flag every disqualifying requirement separately.

  2. 2

    Review design

    Check alignment among the problem, activities, outputs and indicators; record evidence supporting the intervention logic.

  3. 3

    Review feasibility

    Calculate direct and indirect costs and delivery capacity; separate confirmed funding from resources still to secure.

  4. 4

    Examine compliance

    Review legal, financial, data-protection and matching-fund requirements with qualified staff; never present assumptions as certifications.

  5. 5

    Resolve

    Prioritize remediable gaps with owners and deadlines; recommend not applying when disqualifying requirements remain unmet.

Worked example: fictional scenario

Entirely fictional example: Red Puentes discovers that its budget does not include monitoring and evaluation costs, and revises the project scope before applying for funding.

Technical criteria for responsible use

How to interpret this resource

Start from the specific call, not the project you wish to promote. Capture mandatory requirements for entity type, location, deadlines, financial ceiling, matching funds, eligible expenditure, attachments and delivery restrictions. Separate exclusion criteria from scored criteria. The budget should reflect actual resources, including monitoring, coordination and eligible indirect costs [1]. A relevant program does not necessarily satisfy a funder's formal conditions.

Evidence needed before deciding

Build a requirement–document–owner–date matrix and flag missing evidence. Reconcile objectives, activities, deliverables, outcomes, timeline, staffing, procurement and unit costs; check own contributions, tax, exchange exposure and liquidity where relevant. Candid distinguishes direct and indirect costs and stresses credible budgets [1]; OECD criteria for coherence and feasibility can inform an initial review [2]. Never upload legal documents, confidential finances or personal records here.

Facilitation and validation

Run a cross-functional review with program, finance, legal and monitoring representatives. Read current call terms before filling the sheet; each person identifies verifiable requirements, assumptions and missing costs. Mark each condition as met, remediable before the deadline or unmet. Walk through implementation to expose cash-flow gaps, dependence on partners and reporting obligations. Document disagreements and commission external review of sensitive clauses.

From findings to a decision

Recommend submit, rectify before submitting or do not submit, giving reasons and stating uncertainty. An application should not proceed with unmet exclusion criteria or a budget that cannot cover obligations. Name the approving authority, an internal deadline before the funder's closing date and review checkpoints. The result is not a probability of success and cannot replace checking current rules and qualified advice.

Methodological quality checklist

  • Each exclusion criterion has been checked against current official call terms.
  • Objectives, activities, outputs, outcomes and evidence are aligned.
  • The budget covers applicable direct, indirect and co-funding costs.
  • Gaps, owners, deadlines and financial risks are recorded.
  • A decision, authorized approver and internal submission deadline are identified.

Common mistakes to avoid

  • Inventing indicators to fit a call for proposals
  • Omitting necessary costs
  • Using people's personal information without authorization
  • Guaranteeing funding by completing a checklist

Scope and limitations

This is an original informational resource. It does not replace legal advice, professional financial analysis, independent evaluation, or institutional approval. It does not offer funding or performance predictions, ESG certifications, or impact guarantees. Do not share confidential documents or personal data.

Foundations and references

The cited sources support methodological principles. The original TBC worksheets are not reproductions of third-party instruments.

  1. Candid (2025). Developing a Nonprofit Budget: The Basics and Best Practices. Open source ↗
  2. OECD (2021). Applying Evaluation Criteria Thoughtfully. Open source ↗

Your draft document

Gap map for financial structuring

This output is an exploratory draft, not an independently validated assessment or certification.

Call for Proposals and Eligibility

Not yet completed

Documented Need

Not yet completed

Objectives and Outcomes

Not yet completed

Activities and Timeline

Not yet completed

Full Budget

Not yet completed

Organizational Capacity

Not yet completed

Safeguards and Compliance

Not yet completed

Gaps and Decision

Not yet completed

TBC / Next resource

Does this decision require more support?

The tool is free and self-contained. If implementation involves multiple stakeholders or constraints, TBC can support project formulation and financing.