Before you start
A sustain-adapt-scale gate must consider results, delivery quality, funding, equity and protection; wider coverage does not automatically mean greater impact.
Deliverable: conditional decision record with evidence, options, risks, authority and stopping thresholds.
Step-by-step application
- 1
Define gate
Specify whether to sustain, adapt, expand or stop the intervention; define scope and decision authority.
- 2
Gather data
Gather outcomes, costs, quality and capacity from the period reviewed; separate process performance from participant changes.
- 3
Examine risks
Seek an outside review of risks, safeguarding, equity and potential failures by someone independent of delivery.
- 4
Compare options
Compare options against resources, expected benefits and indispensable controls; document uncertainty and distributional consequences.
- 5
Formalize
Record the authorized decision, stop conditions and next evaluation date; avoid irreversible commitments without sufficient evidence.
Worked example: fictional scenario
Entirely fictional scenario built from scratch: In the (fictional) Travesía Network, the program shows high coverage but protection incidents; management halts expansion until they are resolved.
Technical criteria for responsible use
How to interpret this resource
State whether the committee must sustain, revise, scale or stop an intervention, and what evidence each choice needs. Apply relevant OECD criteria for relevance, effectiveness, impact and sustainability [1] without turning them into automatic scores. Distinguish program results from implementation fidelity [2] and the rights of affected people.
Evidence needed before deciding
Collect outcomes with periods and denominators, implementation observations, recurring costs, risks, incidents and participant perspectives. Explain contextual differences and who may be excluded by expansion. Compare positive results with failures and places where the program did not work. Keep sensitive records outside this public site; aggregate indicators do not remove safeguarding obligations.
Facilitation and validation
Simulate four options: continue unchanged, adapt, scale cautiously or stop. For each ask for supportive and adverse evidence, funding capacity and plausible harm, appointing someone to challenge assumptions. Agree non-compensable risks that require stopping regardless of coverage. Record votes and decision powers under the committee's actual rules.
From findings to a decision
Issue a conditional decision record specifying the choice, approver, review date, quality indicators and triggers for revision or suspension. Do not confuse completed activities with causal impact or treat this worksheet as budget authorization. Where unresolved safeguarding incidents exist, pause expansion until the appropriate process confirms controls.
Methodological quality checklist
- Options and authority of the body explicit.
- Outcomes and quality sourced and dated.
- Equity, costs and potential harm considered.
- Non-compensable thresholds and stop rules set.
- Conditional decision and review date recorded.
Common mistakes to avoid
- Escalating due to funder pressure
- Ignoring incidents without formal reports
- Extrapolating from a single context
- Equating spending the budget with successful outcomes
Scope and limitations
This is an original, indicative, and unvalidated working resource used as a measurement tool. It does not replace professional advice, ethics committees, institutional decisions, participant consent, or assessments designed to establish causality. The use of fictitious or non-personal information is recommended.
Foundations and references
The cited sources support methodological principles. The original TBC worksheets are not reproductions of third-party instruments.
- OECD (2021). Applying Evaluation Criteria Thoughtfully. Open source ↗
- Proctor, E. et al. (2011). Outcomes for Implementation Research: Conceptual Distinctions, Measurement Challenges, and Research Agenda. Administration and Policy in Mental Health, 38, 65–76. Open source ↗